I ran down to the ramps at Farrington Point today (10/16) at lunch to see what I could catch (2 small bass). While there, I noticed that they were pouring the concrete block at the top of the two left ramps to attach a new pier to. No idea when it will be in, but will be a nice setup when done

.
Looked like a lot of heavy equipment heading into the lot today, so not sure what else they are getting ready to do, must be taking advantage of the dry weather.